Prehistory of the GEMINI next Generation project

It started in autumn 1991 with the GEMINI habitable solar power plant, 2011 with the initiative Solar Building Land and 2018 with GEMINI 66 - we build our house ourselves.






  1991 GEMINI inhabited solar power plant


What does a house look like that makes an adequate contribution to the overall energy supply of an industrial state as far north as Germany? First of all, the energy supply and the switch to 100% renewable energy had to be investigated.

Biomass has a catastrophically low yield compared to photovoltaics or wind energy. Therefore everything has to be converted to electricity. A review of the sectors showed that the electricity demand will increase from 500 TWH in 1990 in Germany to 1200 TWh in 2040.

A simple calculation that was contrary to the dogmas of that time. Only in summer 2016 this was fully confirmed by the Study Sector Coupling by Prof. Volker Quaschning.

1200 TWh divided by 80 million inhabitants times 2 inhabitants per house results in 30,000 kWh. The project "GEMINI inhabited solar power plant" was therefore designed with this annual yield in mind.

  2001 GEMINI House in Weiz


A strongly reduced form of the GEMINI Haus, only 8,500 kWh annual yield, was the main attraction of the Styrian regional energy exhibition in 2001. It is a Worth seeing the city of Weiz.

  2011 Solar building land


Affordable living and affordable energy turnaround. Bungalow terraced housing estates as a basis.

  • 10,000 inhabitants per km²
  • 90 MW per km², 90 GWh annual yield

  2018 GEMINI 66 - we build our house ourselves


An extremely cost-optimized house with a lot of possibilities for personal contribution. But it also showed how incredibly quickly over 100 tons of concrete can be laid. The foundation, the prestressed concrete slabs and the weight of the concrete in tons is three digits.

The project GEMINI 66 in Faistenau failed. Why? From April 2018 to January 2019 I was the only serious interested person in this very beautiful property. That already says enough about the resistance of the local politics.

  2019 GEMINI next Generation


Is it also 80% easier, 80% less building material? After optimizing the energy balance after the production of the house only to optimize the energy balance during the production of the house.

  Historical development and current statements


This subdomain GEMINIs.pege.org and the subdomain Invests.pege.org shows the historical development of the project. GEMINI-next-Generation.house shows current statements of GEMINI next Generation AG.

GEMINI next Generation - energy + food + living comfort GEMINI next Generation - energy + food + living comfort
What can housing cost? Where can you build? How much Energy should a house produce? How much building material is needed? GEMINI n.G. is looking for completely new answers to these questions.


Where can and should GEMINI next Generation be built? Where can and should GEMINI next Generation be built?
Using existing land better and building where conventional houses cannot or are not allowed is an important objective of the GEMINI next Generation project.


How much energy should a house generate? How much energy should a house generate?
As much as possible! Because we need to get out of oil, coal, biofuel, natural gas and uranium. Our houses should contribute as much as possible.


Project GEMINI next Generation 2019 Project GEMINI next Generation 2019
Security, Production hall near Bleiburg, Study Jordan, Flyer for lectures 2020, Cyclist vs commuter, Press release December,



Project GEMINI next Generation 2020 Project GEMINI next Generation 2020
ORF Salzburg, Lecture, , No. thanks!, Food, Electricity Distribution 2.0, RE unleashed, From the factory,



Project GEMINI next Generation 2021 Project GEMINI next Generation 2021
*, Rethinking cities, *, Rethinking energy transition, Summer/Winter, Energy Social Food transition, , Material test, 100% solar?, Ventilation system, Heat pump, Disruption, Optic,



Project GEMINI next Generation 2022 Project GEMINI next Generation 2022
Housing counseling, Cheaper than rental apartment, Salzburg Heute, , Off-Grid Augsburg,





How much can living cost?
This is not only a question of existence for the individual, but also for society as a whole. The competitiveness of the national economy is destroyed by high housing costs.


How much building material is needed?
The amount of building material starts with the decision how many floors to build. The step from just the ground floor to the first floor is a huge leap.




          Prehistory of the GEMINI next Generation project: It started in autumn 1991 with the GEMINI habitable solar power plant, 2011 with the initiative Solar Building Land and 2018 with GEMINI 66 - we build our house ourselves. https://geminis.pege.org/prehistory/